Automatic Tool Changer (ATC) Installation Manual • December 1, 2016
© Copyright 2016 ShopBot Tools, Inc.
page 26
Touch the grounding clip to the fixed Z zero plate. Input
“1” should light up green each time that the grounding clip
contacts the fixed Z zero plate.
Turn on air supply.
Hold the tool holder in the spindle and press the green button on the spin-
dle (see picture on left). When the button is pushed, the internal drawbar
will open (release/accept tool holders).
A rush of air will be heard and input “8” will light up.
Release the button. The drawbar will close (captures tool holders). With
the tool holder in place, input “7” will be lit and input “8” will go off.