19(33)
3.3 Installation of SAL-G Optional Proportional Valve
SAL-G
Material
storage
tank
Material
storage
tank
ACF
IMM
Picture 3-4: Optional SPV-U Installation Layout
Optional proportional valve SPV-U can realize two kinds of materials mixing.
Installation:
1) Mount the SPV-U at material inlet of SMH(SVH) lock up and fix the screws.
2) Put the SMH on SCH-6L or put the SVH at the material inlet of molding
machine. Point to the holes and lock up the screws, then connect the signal
wire to the hopper loader of SAL-G.
3) Connect the air inlet of vacuum hopper with steel wire hose separately to
corresponding air inlet of SAL-G. Connect the material inlet of storage silo to
the material inlet of vacuum hopper.
3.4 Installation of SAL-G Optional Cyclone Dust Seperator
SAL-G
ACF
IMM
Material
storage
tank
Picture 3-5: Optional ACF-1 Installation Layout
When conveying plastics contain dusts in high proportion, optional dust cyclone
separator is recommended to reduce the purging times of main machine filter.