1
Table of Contents
Specifications ............................................................................ 6
Ambient Conditions ................................................................... 7
External View/Part Names ........................................................ 7
Operation Panel Part Names .................................................... 9
Controller ................................................................................. 10
Warning Indicators .................................................................. 13
Meters and Switches ............................................................... 15
Frequency change................................................................... 16
Fuel Piping Switch (3Way Fuel Valve) ..................................... 17
6. Transporting/Installing ..................................................................... 17
Transport Procedures .............................................................. 17
Installation Procedures ............................................................ 18
7. Load Connections ............................................................................ 19
Load Cable Selection .............................................................. 19
Connecting Load Cables ......................................................... 19
Earth Leakage Relay and Grounding ...................................... 21
8. Pre-Operation Inspection ................................................................. 22
Checking Engine Oil ................................................................ 22
Checking Coolant .................................................................... 23
Checking the Fuel ................................................................... 24
Checking for Fuel, Oil and Coolant Leaks ............................... 24
Checking the Battery ............................................................... 25
9. Operating Procedures ...................................................................... 26
Initial Startup/Pre-Check .......................................................... 26
Procedures during Operation .................................................. 28
Stopping Operation ................................................................. 29
Protective Functions ................................................................ 29
Connecting with External Fuel Tank ........................................ 31
10. Inspection/Maintenance ................................................................. 32
11. Long-Term Storage ......................................................................... 38
12. Troubleshooting ............................................................................. 39
13. Generator Circuit Diagram ............................................................. 42
14. Engine Electrical Circuit Diagram ................................................. 44
Содержание DG25MK
Страница 2: ......
Страница 45: ...42 1 400 440V 13 Generator Circuit Diagram...
Страница 46: ...43 2 200 220V...
Страница 47: ...44 14 Engine Electrical Circuit Diagram...
Страница 48: ...2019...