47
4.1
4
.
4
.
GC-2014
4 Installing Capillary Columns and Setting Analytical Flow Lines
4.1
Installation Location for Capillary Columns
Injection ports and detectors for capillary columns can be installed in positions described in
Table 4.1.1 and Fig. 4.1.1.
(Injection ports and detectors that can be used for packed columns are included.)
Table 4.1 Installation location for injection ports/detectors for capillary columns
Installation location numbers indicate the positions of column connecting joints.
Name
Possible installation location
Injection ports
SPL
1, 4
WBI
1, 4
Dual INJ
1-2, 2-3, 3-4
Single INJ
1, 4
Detectors
Dual FID
6-7
Single DET
5, 6, 7, 8
FTD-2014c
11, 12
TCD
9-10
Fig. 4.1.1
Installation location for injection ports/detectors for capillary columns
(layout viewed from the top of the unit)
Содержание GC-2014
Страница 4: ...This page is intentionally left blank ...
Страница 12: ...Contents viii GC 2014 This page is intentionally left blank ...
Страница 28: ...1 Installation 1 3 Gas Supply Plumbing 16 GC 2014 This page is intentionally left blank ...
Страница 42: ...2 Before Use 2 6 Connecting the Relay Terminals 30 GC 2014 This page is intentionally left blank ...
Страница 78: ...5 Analysis 5 2 Notes for Analysis 66 GC 2014 This page is intentionally left blank ...
Страница 90: ...6 Basic Key Operation 6 4 Getting Help 78 GC 2014 This page is intentionally left blank ...
Страница 130: ...11 Creating an Oven Temperature Program 11 2 Temperature Programs 118 GC 2014 This page is intentionally left blank ...
Страница 164: ...12 Injection Port 12 5 Setting the Flow Rate Parameters 152 GC 2014 This page is intentionally left blank ...
Страница 282: ...16 Special Functions 16 10 ROM Version No 270 GC 2014 This page is intentionally left blank ...
Страница 318: ...306 GC 2014 This page is intentionally left blank ...