
Appendix B Power Connection of Modular System
60
Shield M10U user manual
Appendix A. Power Connection of Modular System
Fig.B-1 and Fig.B-2 illustrate the power connection of modular UPS in what are known as the 3/3, 3/1, 1/3 and 1/1
configuration.
Note
If split-bypass input is needed, please disconnect the linked copper bars (phase A, B,C)
If 3/1, 1/1, 1/3 power connection are needed, optional copper kits are required. Set UPS as 3/1, 1/3 or 1/1 with software.
Fig.B- 1: Power Connection of 2 slots and 4 slots
Fig.B- 2: Power Cables Connection of 6 slots cabinet
➢
3 phases in, 3 phases out
(common input) is default setting. If need
3 phases in, 3 phases out (split bypass input),
remove connecting copper bars between bypass and main input as Fig.B-1 and Fig.B-2.
➢
If need to set UPS as
3 phases in, 1 phase out
, connect cables as Fig.B-1 and Fig.B-2 as needed. Then set UPS with
software as below:
Enter in “
RateSetting
”, set
output
as
in
Syscode Setting1
, set
input
as
in
Syscode Setting 2
, then confirm the set.
警告
危 险
Содержание M10U
Страница 1: ......
Страница 9: ......
Страница 71: ...Appendix B Power Connection of Modular System 62 Shield M10U user manual ...