
40 |
P a g e
OPERATION (CONTINUED)
End of procedure
Establish an Anaerobic Atmosphere (Continued)
16.
Optional
. Set the incubator(s) temperature set point.
a. While waiting for the oxygen purge to complete, you may set the
temperature set point of the incubators to your application
temperature.
b. Each incubator comes from the factory set to run at 37°C.
Setting the Incubator Temperature
procedure
on page 47.
Optional
17. End state
BACTRON300
. When the purge has gone through 200 psi of AMG
or
gone on for 2 hours (whichever happens first), tighten and secure the
right arm port door. Then carry out the
, and
Verifying Anaerobic Atmosphere
procedures on the following pages.
BACTRON600
and
BACTRON900
. When the purge has used 400 psi of
AMG
or
gone on for 4 hours (whichever happens first), tighten and
secure the right arm port door. Then carry out the
, and
Verifying Anaerobic Atmosphere
procedures on the following pages.
BACTRON300
200 psi AMG
Or
2 Hours
BACTRON600 and 900
400 psi AMG
Or
4 Hours
18. Seal the right arm port door when the end state has been achieved.
a. Turn the knob on the arm port door to the right (clockwise) until
snug, using finger strength.
Содержание BACTRON300
Страница 2: ...2 P a g e This page left blank...
Страница 13: ...13 P a g e RECEIVING YOUR BACTRON CONTINUED This page left blank...
Страница 25: ...25 P a g e INSTALLATION CONTINUED This page left blank...
Страница 28: ...28 P a g e GRAPHIC SYMBOLS CONTINUED This page left blank...
Страница 57: ...57 P a g e OPERATION CONTINUED This page left blank...
Страница 65: ...65 P a g e USER MAINTENANCE CONTINUED This page left blank...
Страница 85: ...85 P a g e ACCESSORIES CONTINUED...
Страница 86: ......