- 11 -
115.6001.10
2
INSTALLATION
2.1
Location
The vaporizer should be located as close to the liquid chemical source as possible. The length of chemical
liquid and gas lines should be kept to a minimum. A vaporizing room should have provisions to exhaust any
leaking gas. A lifting device above the vaporizer is also required. See Figure 5 for dimension requirements.
2.2
Mounting
Install the vaporizer on a mounting pad of concrete or other suitable material approximately 2" (50 mm) high.
Secure using 3/8" diameter bolts. See Figure 4 for mounting hole dimensions.
NOTE:
It is recommended that the vaporizer cabinet enclosure be removed from the water tank before
moving the unit from the shipping skid to the mounting pad. This will prevent any damage to the cabinet. On
completion of the vaporizer installation, the enclosure can be reinstalled.
Figure 5 - Cabinet Dimensions and Ultility Locations
Содержание VAX4600 Series
Страница 4: ...115 6001 10 4...
Страница 6: ...115 6001 10 6 Figure 1 Vaporizer Flow Diagram Figure 2 Chemical Boiling Points at System Pressure...
Страница 9: ...9 115 6001 10 Figure 4 Cabinet Dimensions Utility Connection Locations...
Страница 12: ...115 6001 10 12 Figure 6 Vaporizer Piping Connections...
Страница 17: ...17 115 6001 10 Figure 8 Chlorine and Sulfur Dioxide Vaporizer Components...
Страница 24: ...115 6001 10 24 Figure 10 Replacing Heater Element...
Страница 26: ...115 6001 10 26...
Страница 27: ...27 115 6001 10...