9 Maintenance
Before maintaining and commissioning the PV inverter and its peripheral distribution,
switch off all the charged terminals of the
WARNING
inverter and wait at least
10 minutes after the inverter is powered off.
9.1 Routine Maintenance
Table 9.1 Maintenance checklist and interval
Check
Check
Maintain content
Maintenance
Item
Content
Interval
inverter
Statistically maintain the status of
NA
Weekly
output
electrical yield, and monitor its abnormal
status
status.
inverter
Check periodically that the heat sink is free Clean periodically
yearly
cleaning
from dust and blockage.
the heat sink.
inverter
Check that the inverter is not damaged or
If there is any
monthly
running
deformed.
abnormal
status
Check for normal sound emitted during
phenomenon,
inverter operation.
replace the relevant
Check and ensure that all inverter
parts.
communications is running well.
inverter
Check that AC, DC, and communications
If there is any
Semiannually
electrical
cables are securely connected;
abnormal
50
Содержание SE 10K Series
Страница 1: ...5K 6K 8K 10K 12K 15K User Manual Ver 00 Shenzhen Senergy Technology Co Ltd 1...
Страница 22: ...Figure 4 6 Installation in triangle mode unit mm 22...
Страница 50: ...49...