![Senergy SE 10K Series Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/senergy/se-10k-series/se-10k-series_user-manual_1239620020.webp)
Figure 4.3
Installation environment with awning (unit: mm)
Carrier Requirements
a. The carrier where the inverter is installed must be fire-proof. Do not install the
inverter on flammable building materials.
b. The wall must be solid enough to bear the weight of the inverter.
c. Do not install the inverter on a wall made of gypsum boards or similar materials
with weak sound insulation to avoid noise disturbance in a residential area.
Installation Space Requirements
a. It is recommended that the inverter be installed at eye level to facilitate operation
and maintenance.
b. Reserve enough clearance around the inverter to ensure sufficient space for
installation and heat dissipation, as shown in Figure 4.4.
20
Содержание SE 10K Series
Страница 1: ...5K 6K 8K 10K 12K 15K User Manual Ver 00 Shenzhen Senergy Technology Co Ltd 1...
Страница 22: ...Figure 4 6 Installation in triangle mode unit mm 22...
Страница 50: ...49...