Model SSD1-HS
508.366.1488 | semshred.com Page 5
of 23
3 - Unpacking
The Model SSD1-HS has been secured to a pallet for shipping. Please inspect equipment immediately for
any shipping damage.
Important Note
: Prior to unpacking, if there is any visible damage to the machine or to the crate during
shipping, the receiver must note what is damaged on the Bill of Lading and contact the shipping
company immediately.
Packaging:
Retain all packaging for a minimum of 90 days after receiving.
Tools needed:
•
Hammer
•
Pry bar
•
Strap cutters
•
Fork truck (lifting capacity minimum 1,000 lbs.)
Unpacking:
1.
Cut straps and remove plastic wrapping from the unit.
2.
Pry off the two boards parallel to the front and rear of the unit.
3.
Using a lift truck, slide forks under unit and lift off the pallet.
4.
Transport unit towards its designated receptacle and rest on to the ground. Be sure to lock
casters in place to reduce chances of unwanted movement.
Unit Location:
The Model SSD1-HS can be located in an office or warehouse area within 10 feet of a wall receptacle. It
is recommended that the machine be at least 3-4 inches away from the wall for proper ventilation.
Note:
This machine is equipped with locking swivel casters for easy movement on flat surfaces. Due to
the weight and size of the unit, SEM recommends using a forklift with a minimum lifting capacity of
1,000 lbs. instead of pushing the unit up or down inclined surfaces so as to avoid potential damage to
the unit and harm to personnel due to loss of control while moving the unit.