Model SSD1-HS
508.366.1488 | semshred.com Page 12
of 23
7 – Maintenance
Important / Caution: Before performing any service or maintenance on this machine, make certain to
de-energize the machine using proper LOTO procedures.
7.1
General Maintenance
Cleaning:
Every eight hours of operation:
1.
De-energize unit using proper LOTO procedures.
2.
Clean all surfaces inside unit and outside with cleaning solution.
3.
Wipe up excess cleaning solution and vacuum all other loose debris.
Lubrication:
Minimum twice yearly or as needed:
1.
Grease fittings are accessible on top of the rotor bearings on each side of the cutting chamber.
2.
Grease with
Gulflex “A”
multi-purpose, or equivalent.
Filter Change:
Approximately every 16-20 hours:
1.
De-energize unit using proper LOTO procedures. SEM recommends wearing a mask, gloves, and
eye protection
2.
Remove the vacuum from the vacuum cabinet.
3.
Unlock the tabs on the sides and pull the vacuum from the container. Remove the hose if
necessary.
4.
Pull the filter out of the middle and replace it.
5.
Replace the vacuum in the container and reattach hose if necessary.