IN0025
- 004952
Revision
05
–
27 of 35
POWER PERFORMANCE PASSION
myGrid
Installation Notes
C
ABLE LOSS CHECK
Power up inverter with the AC source turned off. Apply a load of at least 2kW to the inverter
and check the “Cable Loss” reading (see below) to be less than 1% of load power for a 24V
system and less than 0.5% of load power for a 48V systems.