IN0025
- 004952
Revision
05
–
12 of 35
myGrid
Installation Notes
B
ATTERY
S
ENSE
C
ABLING AND
B
ATTERY
T
EMPERATURE
S
ENSE
Disconnect the battery temperature sensor cable from the SP PRO or SP PRO GO expansion
card and feed it through with the Precharge / Battery Sense cable (end without M10 Ring lugs)
from DC Switchbox to the SP PRO or SP PRO GO via conduit and glands.
Strip Precharge / Battery Sense cable to bear each lead and connect into the terminals as
indicated
–
B+ : Brown
B MID : Yellow
B- : White
Note: Take care to observe minimum strip lengths.
Reconnect the battery temperature sensor cable to the expansion card as indicated
–
SUPPLY : Grey
BATT TEMP : Grey
Note: Temperature sensor is not polarity sensitive and can be connected either way.
M
AIN
B
ATTERY
C
ABLING
Feed Black B- cable (without battery lug) from DC Switchbox to the SP PRO or SP PRO GO
directly below the B- terminal via conduit and glands.
Feed Red B+ cable (without battery lug) from DC Switchbox into the SP PRO or SP PRO GO
directly below the B+ terminal via conduit and glands.
Remove the pre stripped insulation and connect into the terminals as indicated
–
B+ : Red
B- : Black
Note: Take care to ensure all strands go into the clamp terminals.