3
STEP 2: BRACKET INSTALLATION
Screw mounting brackets into the
skylight header with the center of
the front attachment screw hole
1” back from the front edge of the
retainer.
Bottom brackets should be
screwed 3” in from the left and
right sides.
3”
3”
Shade
Width
Top Bracket
Location
15” - 20”
2
1
⁄
2
”
>20” - 32”
4
1
⁄
2
”
>32”- 48”
6
1
⁄
2
”
1” from front edge
of retainer to C/L of
attachment hole
Top bracket location depends on
width of shade (see chart)
1”
3” Bottom Brackets
see chart for top bracket placement
Top bracket positions depend on
the width of the shade. Refer to
chart for location.