BREEZAIR EXQ/EZQ/EXS EVAPORATIVE COOLERS INSTALLATION MANUAL
|
3
STEP 6
MOUNT COOLER
Mount cooler to the dropper.
Check tank is level.
STEP 16
WATER LEVEL & DRAIN
Set the water level.
Test the drain valve.
STEP 22
CUSTOMER HANDOVER
Show customer how to operate the
cooler. Give them both the MagIQtouch
Controller and cooler owner’s manual.
Explain maintenance requirements.
Page 7
Page 14
Page 16
STEP 4
MOUNT DROPPER
Position, level, secure and flash the
dropper.
STEP 10
REGULATIONS
Read & adhere to the local & national
electrical and plumbing regulations.
STEP 17
REFIT PAD FRAMES
Refit the pad frames before testing the
pump.
STEP 5
CONVEY COOLER
Convey the cooler to the roof.
Note
! Always use 2 people when
handling manually.
STEP 11
INLET SOLENOID
Fit the solenoid.
Connect the cable.
Connect the water supply.
Install the drain pipe.
STEP 18
TEST PUMP
Turn on the cooler and check the water
is evenly distributed to all pads.
STEP 12
DRAIN VALVE
Fit the drain valve.
Connect the discharge system.
Connect the cable to the cooler
electronics.
Page 5
Page 9
Page 14
Page 6
Page 15
Page 11
A
C
D
E
B
2
3
1
Page 10
QUICK GUIDE