COMMISSIONING COMPLETION CHECKLIST

DUCTWORK

 

□ NO LEAKS - All ducts are hung correctly and there are no air 

leaks.

 

□ CONTROLLER SEALED - All wall holes behind the 

MagIQtouch controller have been sealed.

 

□ QUIET - Check that the cooler runs quietly and with an even 

distribution of air to all outlets. 

 

□ AIR BALANCE - The air balance for all outlets has been 

adjusted to the customer’s satisfaction.

FLUSHING CHILLCEL PADS

 

□ PADS FLUSHED - To prevent initial start-up odours from the 

cooling pads, it is a requirement to flush water through them 

and drain the tank. Operate in COOL mode, lowest speed 
for 5 minutes, then drain the tank. Repeat several times if 
necessary.

FINAL TEST

 

□ Once you are satisfied that the cooler is installed and 

commissioned correctly, run the cooler and ensure that 
everything is working as it should.

CUSTOMER HANDOVER

 

Principles of Ducted Evaporative Cooling explained.

 

How far the windows need to be opened.

 

How to turn the cooler on.

 

How to operate the MagIQtouch controller.

 

How to drain the cooler.

 

How to isolate power and water to the cooler.

 

Maintenance Schedule requirements.

 

The customer has been given the owner’s manuals & 
warranty card.

CLEAN-UP

 

All the installation rubbish has been removed and, if 
applicable, any property damage repaired. Your aim should 
be to have the customer not even be aware that you have 
been on site.

FINAL CHECK

 

 With all chillcel pads and panels in place and the unit running 
for a short period in cooling mode, ensure all pads have even 
water saturation and there are no visible water leaks.

COOLER

 

□ SECURE - The cooler is secure and level on the dropper 

using all fixings supplied.

 

□ SEALED - The dropper and all penetrations are correctly 

flashed and sealed.

WEATHERSEAL

 

□ OPERATES - The Weatherseal operates correctly and can 

open and close without interference.

PLUMBING

 

□ FLUSHED - The water pipes were flushed of any foreign 

materials before connection to cooler was made.

 

□ NO EXTERNAL LEAKS - The water is connected with no 

leaks at fittings. 

 

□ NO INTERNAL LEAKS - C

heck all internal water hoses 

are securely fitted to water distribution spreaders and other 

internal fittings.

 

□ SECURE - Water pipes are correctly saddled as per plumbing 

regulations.

 

□ OWNER INSTRUCTIONS - The owner has been instructed 

on how to isolate the water to the system in case of 
emergency.

DRAIN VALVE

 

□ INSTALLED - The drain valve is installed correctly, as detailed 

in this installation manual.

 

□ DISCHARGE - The drain water does not discharge onto the 

roof surface.

 

□ WATER LEVEL - Water level has been set correctly, as 

detailed in this installation manual.

 

□ TESTED - Drain the tank. Check the drain fittings and pipes, 

making sure there are no leaks.

POWER

 

□ REGULATIONS - The power supply adheres to all local and 

national regulations and is wired back to the distribution board 
on its own separate circuit.

 

□ CHECK CABLES - Cables have been correctly connected to 

the control boxes:

 

Power supply

 

□ Motor cables (x2)

 

Control cable

 

Drain valve

 

Solenoid cable

 

Pump cable

 

Probe cable

 

□ OWNER INSTRUCTIONS - The owner has been instructed 

how they can electrically isolate the unit at the meter box in 
case of an emergency.

Содержание EXQ

Страница 1: ... English INSTALLATION MANUAL EXQ EZQ EXS Evaporative Coolers ILL1672 A Original English Instructions ...

Страница 2: ...NG THE DRAIN VALVE OR BLEED TRAY 11 HARMONY AND HORIZON DRAIN VALVE ASSEMBLY 11 HOMEMAKER BLEED TRAY 11 CONNECTING THE MAGIQTOUCH MAGIQCOOL CONTROLLER 12 COMMISSIONING THE COOLER 12 Diagnostic LED 12 Salinity LED 12 MagIQtouch Controller Information 13 External Air Sensor Feature 13 TESTING THE DIRECT DRIVE MOTOR 13 CHANGING THE WATER MANAGEMENT METHOD FOR THE MAGIQCOOL CONTROL 13 SETTING THE WATE...

Страница 3: ... If a worker is alone who knows they are there and if they get into difficulty how can they summon help Call someone on the ground Mobile phone etc What condition is the roof in Should the trusses underside or surface be checked Does the worker have appropriate foot wear Flat sole jogger type is advisable Are all power cables extension leads safe and appropriately rated Are all ladders tools and e...

Страница 4: ...tronics Test the Direct Drive motor STEP 21 CLEAN UP Clean up the site STEP 3 PREPARE DROPPER Cut hole fit grommet in dropper for cables STEP 8 CONTROLLER CABLE Connect one end of the controller cable to cooler electronics then feed the other into dropper Page 1 Page 7 Page 12 Page 16 Page 4 Page 12 Page 16 Page 8 Page 5 STEP 7 POWER CABLE Unhook the plug under the cooler Feed power cable down int...

Страница 5: ...r STEP 10 REGULATIONS Read adhere to the local national electrical and plumbing regulations STEP 17 REFIT PAD FRAMES Refit the pad frames before testing the pump STEP 5 CONVEY COOLER Convey the cooler to the roof Note Always use 2 people when handling manually STEP 11 INLET SOLENOID Fit the solenoid Connect the cable Connect the water supply Install the drain pipe STEP 18 TEST PUMP Turn on the coo...

Страница 6: ... flue 5m 17 from a sewer vent and 600mm 2 from a wall The cooler must be mounted at least 3m 10 preferably 5m 17 away from any TV antenna or antenna cables Make sure the cooler is not between the antenna and the transmission tower that is providing the television signal to the home Allow adequate access to and around the cooler for maintenance Provision must be made for access to electricity water...

Страница 7: ...atherseal Before transporting to the roof temporarily screw the transition to the dropper using a screw in each corner Affix gauge timbers under the top and bottom edges of the transition with 30mm 1 2 screws supplied ILL1646 A ILL951 B EXTRA NOTES FOR EZQ MODEL ONLY MOUNTING THE DROPPER EXQ EXS MODEL EZQ MODEL ILL1647 A ILL182 H Install the dropper and securely fix it to the roof structure on 3 s...

Страница 8: ...ion Pivot the transition dropper off the appropriate gauge timber top or bottom until the level reads true Hold dropper in place using one single screw into the rafter This will set the dropper at an angle of 24 Check for lateral level by placing level vials in the top or bottom wells Note Very few roof slopes will contact both gauge timbers once the dropper is properly levelled As a general rule ...

Страница 9: ...the low gutter side of the installation EXTRA NOTES FOR EZQ MODEL ONLY ILL1292 B Important Ensure the four tab screws which are removed to separate the transition from the cooler are re fitted behind the tabs after the cooler has been fitted into position Carefully lift the cooler onto the transition piece and lower downwards ensuring all nine clips have engaged ILL1649 A ILL1650 A ILL525 D Check ...

Страница 10: ... dropper grommet before fitting ductwork Note The maximum length for the wall control cable to travel alongside the power cable is 10m 33 WARNING Do not let the cable the cable ends or the control box get wet Position the cable in the dropper so they will be accessible from inside the roof space INSTALLING THE MAINS POWER CABLE The power cable included with your cooler will either have a mains soc...

Страница 11: ...ed directly onto the manual water shut off valve Always ensure that the water pipe connection does not place sideways strain onto the float valve Homemaker A permanent water supply is required to be connected to the float valve The water connection point is located on the underside of the cooler The water connection fitting is a 1 2 BSP male adaptor suitable for a compression fitting Do not fit th...

Страница 12: ... been fitted place the cover over the assembly Make sure the solenoid valve cable is retained in the groove in the cooler tank Secure the cover by tightening the flexible hose assembly nut C Important Make sure the cable cannot lay in the water at any stage Connect the electrical leads to the solenoid The electrical cable leads may be connected to the solenoid either way around Important If freezi...

Страница 13: ... drain adaptor Make sure the drain water discharge flows freely away from the cooler Important Do not over tighten plastic fittings Connect the drain valve cable to the cooler electronics box HARMONY AND HORIZON DRAIN VALVE ASSEMBLY Assemble the drain valve as shown HOMEMAKER BLEED TRAY Fit the bleed tray as shown Screw the nut up tightly by hand underneath the cooler Do not overtighten Note Make ...

Страница 14: ...lets in the following lengths Part No Length Details 833880 20m MagIQtouch Controller Cable No Ferrite 823553 20m MagIQtouch Controller Cable With Ferrite 862873 1 5m MagIQtouch Controller Cable No Ferrite 861265 3m MagIQtouch Controller Cable No Ferrite 864396 30m MagIQtouch Controller Cable With Ferrite 864402 40m MagIQtouch Controller Cable With Ferrite CONNECTING THE MAGIQTOUCH MAGIQCOOL CONTR...

Страница 15: ...linity control to regular operation of the drain valve every 65 mins follow these programming steps To enter Parameter mode the following process must be carried out within 4 minutes of power being applied to the cooler If unsure of time since the last power ON remove power to the cooler Isolator Switch or Circuit Breaker for a minimum of 6 seconds so the mode can be entered 1 While wall control i...

Страница 16: ...ir to fill with water The float valve will eventually stop the water from entering the cooler Wait for this to happen and check the water level If the level is too high rotate the float clockwise Drain some water from the tank and allow it to refill to the new set point If too low rotate the float in an anti clockwise direction For EXQ EXS model the correct water level is approximately 5mm above t...

Страница 17: ...ump will run for 90 seconds before the fan is switched on Salinity Level Sets the salinity level at which the tank will drain in SALINITY MEASUREMENT mode Tank Drain Delay Sets the time delay before the drain valve opens after the pump in the cooler is turned off AutoClean Select the preferred cleaning interval 50 100 200 hours At 8 00am after the selected running hours has been reached the cooler...

Страница 18: ...ing mode ensure all pads have even water saturation and there are no visible water leaks COOLER SECURE The cooler is secure and level on the dropper using all fixings supplied SEALED The dropper and all penetrations are correctly flashed and sealed WEATHERSEAL OPERATES The Weatherseal operates correctly and can open and close without interference PLUMBING FLUSHED The water pipes were flushed of an...

Страница 19: ...estart the cooler MagIQtouch Controller failure Replace MagIQtouch Controller Pump runs but no water circulation Pump runs but pads lack water Insufficient water in tank Adjust float level Water hoses blocked Check and clean out blockage Pump strainer blocked Clean pump strainer Insufficient water supply pressure Check and confirm water supply pressure Water solenoid is installed incorrectly Check...

Страница 20: ...NGHAM NG15 7HP UNITED KINGDOM SEELEY INTERNATIONAL AMERICAS LTD 1002 S 56TH AVENUE SUITE 101 PHOENIX ARIZONA 85043 USA SEELEY INTERNATIONAL AFRICA PTY LTD 6 WITTON ROAD FOUNDERSVIEW SOUTH MODDERFONTEIN 1609 GAUTENG SOUTH AFRICA EXQ EXS Cooler Installation Manuals Now provided on the internet available in English French German Italian and Spanish Refer www seeleyeurope com French Manuel d Installat...

Отзывы: