i
|
TABLE OF CONTENTS
SAFETY 1
Employer and Employee Responsibilities
1
Installer and Maintenance Contractors – Risk Assessment
1
QUICK GUIDE
2
COOLER LOCATION
4
EZQ DISASSEMBLY
4
PREPARING THE DROPPER
5
MOUNTING THE DROPPER
5
Levelling the Dropper / Transition
6
Securing the Dropper & Transition
6
Sealing the Dropper
6
CONVEYING THE COOLER TO THE ROOF
6
MOUNTING THE COOLER
7
WEATHERSEAL AND LATCH
7
Locked Position
7
Operating Position
7
INSTALLING THE MAINS POWER CABLE
8
INSTALLING THE CONTROLLER CABLE
8
MULTIPLE COOLER INSTALLATIONS WITH EXTERNAL AIR SENSOR
9
ELECTRICAL REQUIREMENTS
9
WATER REQUIREMENTS
9
INSTALLING THE INLET SOLENOID
10
INSTALLING THE DRAIN VALVE OR BLEED TRAY
11
HARMONY AND HORIZON DRAIN VALVE ASSEMBLY
11
HOMEMAKER BLEED TRAY
11
CONNECTING THE MAGIQTOUCH/MAGIQCOOL CONTROLLER®
12
COMMISSIONING THE COOLER
12
Diagnostic LED
12
Salinity LED
12
MagIQtouch Controller Information
13
External Air Sensor Feature
13
TESTING THE DIRECT DRIVE MOTOR
13
CHANGING THE WATER MANAGEMENT METHOD FOR THE MAGIQCOOL CONTROL
13
SETTING THE WATER LEVEL
14
TESTING THE DRAIN VALVE
14
REFITTING THE PAD FRAMES
14
PAD FRAME POSITIONS
15
TESTING THE PUMP
15
ADJUSTING COOLER SETTINGS
15
COMMISSIONING COMPLETION CHECKLIST
16
TROUBLE SHOOTING
17
WARNING! Failure to install and commission the product in compliance with these in-
structions, or failure to do the job properly and competently, may void the customer’s
warranty. Further, it could expose the Installer and/or the Retailer to serious liability.