20
|
TBA Evaporative Cooler
Owner Name: ..............................................................................
Address: ..................................................................................................................................................................................................
Dealer: .........................................................................................
Date Installed: ............................................................................
Serial No: ....................................................................................
It is the policy of Seeley International to introduce continuous product improvement.
Accordingly, specifications are subject to change without notice.
Please consult with your dealer to confirm the specifications of the model selected.
INSTALLATION CHECKLIST
Signed by Installer: ...................................................................
Dated: .........................................................................................
Telephone: ..................................................................................
Installer: ......................................................................................
Model No: ...................................................................................
□ The cooler is secure and level on the dropper using all fixings supplied.
□ The dropper and all penetrations are correctly flashed and sealed.
□
The Weatherdamper operates correctly and can open and close without interference.
□ The water pipes were flushed of any foreign materials before connection to the cooler was made.
□ The water is connected with no leaks at fittings.
□
Water pipes are correctly saddled as per the plumbing regulations.
□
The drain valve is installed correctly, as detailed in this manual.
□
The owner has been instructed on how to isolate the water to the system in case of emergency.
□
The drain water does not discharge onto the roof surface.
□
Water level has been set correctly, as detailed in this installation manual.
□
The power supply adheres to all local and national regulations and is wired back to the distribution board on it’s own separate
circuit.
□
The following cables have been correctly connected to the Control box as required i.e. Power supply, Motor cable, Control loom,
Drain valve, Solenoid cable, Pump cable, Probe cable.
□
The owner has been instructed how they can electrically isolate the unit at the meter box in case of an emergency.
□
All ducts are hung correctly and there are no air leaks.
□
The system has been run from the customers wall control and all functions work correctly. All wall holes behind the controller have
been sealed.
□
The air balance for all outlets have been adjusted to the customers satisfaction.
□
The customer has been shown how to operate the system and is aware of the need for the timed Drain or Bleed systems.
□
The customer has been given the Owners Manual.
□
All the installation rubbish has been removed and, if applicable, any property damage repaired.
TO THE INSTALLER
Seeley International Pty Ltd is a company committed to continuous improvement. This includes all facets of our business. If you
would like to be part of this ongoing commitment by expressing your thoughts on how we can improve this installation manual, or
how we can improve the product or it’s installation, we’d be more than pleased to receive them.
The empty space (below) is your area to complete as you like. Simply forward it to any State Office of Seeley International Pty Ltd or
mail it direct to:
Seeley International Pty Ltd,
112 O’Sullivan Beach Rd,
P.O. Box 164
Lonsdale SA 5160
AUSTRALIA
A.C.N. No. 054 687 035
Attention: Sales Manager.