SEELEY INTERNATIONAL - INSTALLATION MANUAL
|
9
INSTALLING THE TRANSITION
cont.
ILL983-B
ILL988-B
Lift the air cooler up and place it onto the Transition. It will only
go one way. Make sure the clips in the four corners engage
correctly. See Diagram. Do not use any screws to attach the air
cooler.
ILL1052-C
ILL1051-C
IMPORTANT!
Do not place the venturi assembly into the air
cooler at this stage.
INSTALLING ELECTRIC CABLES
ILL1053-C
ILL1288-C
Disconnect the Electronics Module from the Water Tank by
removing the screw under the isolation switch. See diagram.
The switch cannot function with this screw removed.
The installation kit supplied contains your power cable with
ends ready to terminate and a wall control cable. Take the
power cable and drop the non-plug end down the hole where
the Electronics Module was and pass it through the conduit
adaptor (factory fitted in the Transition). Then lock the plug on
the other end in place as shown - see diagram. Pass the taped
end of the wall control cable through the conduit adaptor also
and leave about 0.5m / 20” in the Water Tank.
Now pass the cables through your main conduit and connect
the main conduit to the conduit adaptor (under the Transition).
IMPORTANT!
Pass the wall control cable through the conduit
first.
Terminate the power cable in a junction box installed nearby.
The fixed wiring must be fitted with an isolation switch that
breaks active and neutral in accordance with wiring rules. We
recommend the junction box is located on the duct.
Do not penetrate the duct near the Weatherseal.
Note!
The maximum length for the wall control cable to travel
alongside the power cable is 10m / 33’.