SEELEY INTERNATIONAL - INSTALLATION MANUAL
|
15
ILL1210-D
INSTALLING THE WALL CONTROL
cont.
Pull the wall control cable through the large hole and wall plate,
remove the protective tape and plug the cable into the wall
control.
ILL1066-D
ILL1068-D
ILL1133-A
ILL1132-A
Feed the excess cable back into the hole and slide the wall
control over the protruding bracket tabs. Pull the wall control
down so the bracket tabs engage with the keyway slots on the
back.
PROGRAMMING THE WALL CONTROL
To enter the programming mode
, the procedure must be
started within four (4) minutes of power being applied to the wall
control. If this time has elapsed then turn off power to the air
cooler for a minimum of 6 seconds before starting the following
procedure.
SET UP FOR BLEED FUNNEL
If you installed the Bleed Funnel instead of the Drain Valve then
you will need to set the wall control and cooler for manual bleed
operation.
1.
While the wall control is OFF, hold down AUTO for at least 3
seconds.
2.
Press
while still pressing
.
3. The setting “A1” will be displayed. Press
until “A4” is
displayed as shown.
4. Press
.
5. A number will now be displayed. Press
until “0” is
displayed as shown.
6. Press
.
Exit the programming mode by pressing the
button.
Abort an alteration by pressing the
button instead of