3-6
SV61611 Rev. B
3 • Basic Operation
Once you select the job that you want to run, you need to set up the system
to run it. This consists of doing the following:
•
Attachng Trays to the Feeder Tower,
if prompted.
•
Loadng Materal nto the Trays
as directed by the Mail Piece Icon Tree
and the loading instructions for the selected job.
•
Loadng the HCEF (Hgh Capacty Envelope Feeder),
if necessary.
The following sections provide more detail about these tasks.
NOTE:
If a HCSF (High Capacity Sheet Feeder) is present, you will need to load
material into it. Refer to
Adjustng the HCSF Gudes
in
Chapter 7
for more informa-
tion.
Setting Up
Feeders and
Loading
Materials
The procedure for attaching either type of Tray to the Feeder Tower, at the
location indicated by the Mail Piece Icon Tree and loading instructions, is
essentially the same:
NOTE:
Use both hands when attaching or removing a Tray.
1. Align the back end of the Tray with the tray mounts in the Feeder Tower.
2. Lift the Separator by pushing up on the Separator Lift Lever (located on
the side of the Feeder Tower).
Attaching Trays
to the Feeder
Tower
Figure 3.1.1: Lift the Separator and slide the Tray into the tray mounts.
Push the lever up to
lift the separator.
Содержание SI5200
Страница 1: ...Operator Guide US Canada English Version Document Inserting System SI5200 SI5400 TM...
Страница 8: ...vi SV61611 Rev B Table of Contents This page is intentionally blank...
Страница 10: ...vi SV61611 Rev B Contact Information List This page is intentionally blank...
Страница 92: ...4 6 SV61611 Rev B 4 Advanced Operation This page is intentionally blank...
Страница 112: ...5 20 SV61611 Rev B 5 Troubleshooting This page is intentionally blank...
Страница 126: ...6 14 SV61611 Rev B 6 Reference This page is intentionally blank...
Страница 180: ...8 36 SV61611 Rev B 8 Scanning This page is intentionally blank...
Страница 188: ...A 8 SV61311 Rev E A Glossary This page is intentionally left blank...
Страница 189: ...Index 1 SV61611 Rev B Index...
Страница 195: ......