INSTALLATION
MANUAL
Product:
Document #:
Rev:
Page:
SEAKEEPER 26 / 20HD
90265
7
1 of 2
Section 4: INSTALLATION SUPPLIES & TOOLS
4.0 Introduction
The Installation Requirements section outlines the components and tools needed for the
Seakeeper installation that are not included within the scope of supply.
4.1 Supplies required for installation
The table below outlines the customer supplied components required for the installation.
AR = As Required
Dwg = Drawing
Item Description
Qty
Installation
Manual
Reference
Other
Reference
System
1
Adhesive and cleaning supplies for bonding to hull
1
Mechanical
2
Soundproofing Considerations
1
Mechanical
3
Spreader bar for lifting the Seakeeper
1
Mechanical
4
Circuit Breaker, AC, 2-Pole, 20 Amp
1
2.2.2
Dwg 90310
Electrical
5
Circuit Breaker, DC, 1-Pole, 10 Amp
1
2.2.2
Dwg 90310
Electrical
6
M6 terminal lug for grounding Seakeeper at rear
brace
1
2.3.1
Electrical
7
Cable, 10 AWG, for grounding Seakeeper at rear
brace to vessel ground (used with item 5)
AR
2.3.1
Dwg 90310
Electrical
8
Marine Sealant
AR
1.5.3
1.6.5
Mechanical
9
Nickel Base Anti-Seize
AR
1.5.3
1.6.5
Mechanical
10
Seawater pump, 230V AC
1
2.2.3
Dwg 90320
Electrical
11
Relay for sea water pump control (Not required if
using 230V AC pump)
1
2.2.3
Electrical
12
¾” (19 mm) ID seawater hose
AR
3
Dwg 90320
Cooling
13
Hose clamps for seawater plumbing to 3/4" (19 mm)
hose barb (2 per hose barb)
4
3
Dwg 90320
Cooling
14
Through-hull fittings (1 high-speed pick-up / 1
overboard discharge)
2
3
Dwg 90320
Cooling
15
Seawater strainer
1
3
Dwg 90320
Cooling
16
Seacock valve
1
3
Dwg 90320
Cooling
17
Flow restriction valve (optional)
1
3
Dwg 90320
Cooling