INSTALLATION
MANUAL
Product:
Document #:
Rev:
Page:
SEAKEEPER 26 / 20HD
90265
7
3 of 4
Section 3: COOLING INSTALLATION
2)
Mix 50% ethylene glycol with 50% distilled water in a clean container. Refer to Table 1 or
glycol manufacturer’s literature for freezing points.
Table 1: Freezing Point
Ethylene Glycol Solution
(
% by volume
)
0
10
20 30 40
50
60
Temperature
(
o
F)
32
23
14
2
-13 -36 -70
(
o
C)
0
-3
-8 -16 -25 -37 -55
3)
Remove pressure cap on top of reservoir. Pour mixture in until level reaches height
shown in Figure 3. Filling reservoir above this level will not cause any damage but
coolant may be expelled from pressure relief port below cap due to normal thermal
expansion of coolant.
4)
Connect 24 V to controller.
•
At the Display check for any ALARMS
•
Press the POWER ON/OFF button
•
The flywheel will start to spin and the glycol pump will start.
•
Recheck glycol level with fluid circulating in coolant circuit. Sight down inside
reservoir and check that coolant level is above upper port on reservoir as shown in
Figure 3. Replace cap.
•
After several minutes of running, press POWER ON/OFF button
to turn
power off to the flywheel and glycol pump. The glycol pump will stop and the flywheel
will coast to a stop.