INSTALLATION
MANUAL
Product:
Document #:
Rev:
Page:
SEAKEEPER 26 / 20HD
90265
7
9 of 13
Section 2: ELECTRICAL INSTALLATION
2. ROUTE SERIAL COMMUNICATIONS CABLE
a. The CAN Cable Assembly (30243, CABLE 3) is a 25 meter shielded cable and the
largest connector is a molded plug with maximum outer diameter of .58 inch
(14.8mm).
b. CABLE 3 must be routed and installed in the vessel from the Seakeeper (female
end) to the Tee Adapter (male end) at the Operator Station.
3. INSTALL OPERATOR STATION EQUIPMENT
a. The Operator Station equipment is installed at the selected location using Electrical
Equipment Mounting Instructions in Section 2.1.
4. CONNECT OPERATOR STATION EQUIPMENT
a. The Operator Station equipment is connected in accordance with the Cable Block
Diagram, 90310.
2.5 Second Operator Station Connection
This section explains how to connect the 2
nd
Operator Station Kit.
Reference Drawings
90467 Helm Display 2
nd
Operator Station Kit
90310 Seakeeper 26/20HD Cable Block Diagram (includes detail of 2nd Operator Station)
1. DETERMINE LOCATION OF 2
ND
OPERATOR STATION
a. The desired location of the 2
nd
Operator Station must be determined with respect
to the 1
st
Operator Station and the vessel arrangement.
b. Typical locations include:
i. Flybridge
ii. Engine room