background image

9

Fig. 6

TYPICAL INSTALLATION

1.    Super Full Tank operator
2.    Mechanical stop 
3.    Control board
4.    Warning lamp 
5.    Photocell tx
6.    Differential switch 16A-0,03A
7.    Photocell rx
8.    Key switch start-stop
9.    Antenna
10.  Column for photocells 
11.  Warning notice 

TYPE OF INSTALLATION

It is possible to install the Super Full Tank with opening inside (Fig. 6)

I n s t a l l   t h e  
operator  always 
i n s i d e   t h e  
p r o p e r t y

inside

Outside

Inward installation

ENTRY

EXIT

Fig. 5

1

3

4

10

10

1

7

5

9

8

2

6

2

11

2x1,5

2x1

3x1,5

2x1

3x1,5

3x1,5

2x1

3x1

RG 58

Leaf weight

Leaf 

lenght (feet)

0 Lbs

9,84

16,40

22,97

29,53

1102,31 Lbs

2204,62 Lbs

3306,93 Lbs

4409,25 Lbs

Содержание SUPER FULL TANK 500 G6 120V

Страница 1: ...it 160 DORAL MIAMI Florida FL 33172 USA Phone 1 305 594 1151 Fax 1 305 594 7325 Toll Free 800 689 4716 web site www sea usa com e mail sales sea usa com REV 02 11 2018 International registered tradema...

Страница 2: ...danger 8 Do not allow children to play or stay within the path of the moving gate 9 Keep remote control or any other control devices out of the reach of children in order to avoid possible involuntary...

Страница 3: ...ng intended installation of the gate operator shall be supplied as part of the installation instructions or as a separate document The following instructions or the equivalent shall be supplied where...

Страница 4: ...es on not assessable further risks SEA USA Inc in its relentless aim to improve the products is allowed to make whatsoever adjustment without giving notice This doesn t oblige SEA to up grade the past...

Страница 5: ...to move toward a rigid objact closer than 16 inches 406mm are not required to be provided with a means of entrapment protection B1 and B2 means of entrapment protection MUST be MONITORED HORIZONTAL S...

Страница 6: ...the whole movement of the leaf PRECAUTIONS SEA motors have been created for the automation of gates used by vehicles only Be aware to avoid the crossing of the gate path because it is very dangerous f...

Страница 7: ...feet or installations in windy places or in case of closed paneled gates SEArecommends the use of the electric lock on operators without block SB moreover the exclusion of electronic slowdown is recom...

Страница 8: ...8 Clevis Attachment Front bracket Shaft Cover End cover Shaft Rear attachment Breather screw Pin rear attachment short Brass Pin long Oil fill in cover By pass valves Fig 4...

Страница 9: ...cells 11 Warning notice TYPE OF INSTALLATION It is possible to install the Super FullTank with opening inside Fig 6 I n s t a l l t h e operator always i n s i d e t h e p r o p e r t y inside Outside...

Страница 10: ...3 39 8 07 8 46 7 87 8 27 7 68 7 68 7 48 7 28 6 69 7 09 6 50 6 30 6 69 5 91 5 51 5 12 3 15 4 72 3 35 4 92 3 94 5 51 5 71 4 72 6 30 4 92 6 50 6 69 5 51 7 09 7 48 7 87 110 90 110 90 105 90 90 102 90 102...

Страница 11: ...If you have to make a n i c h e o b s e r v e t h e dimensions shown in Fig 8 RELEASE MOUNTING Remove the transporting plate as shown in Fig 9 Mount the release as shown in Fig 10 a d b 70 87 2 56 2 5...

Страница 12: ...nd clevis attachment must be done by the simple pressure of the hands Attention Do not incline the hydraulic operator further than the allowed angle of the oscillating bracket 1 risks the possible bra...

Страница 13: ...t in the closed position execute the following operations 1 Release the operator 2 Pull out completely the chromate shaft and push it back in 0 4 inches 3 Attach the shaft to the front bracket Fig 14...

Страница 14: ...ASE 3 W 4 5 MOTOR HEATING DETECTOR CONTACT NC 6 GROUND YELLOW GREEN GV 1 2 3 4 5 6 Fig 19 ATTENTION It is obligatory to remove the breather screw at the end of the installation BREATHER SCREW Unscrew...

Страница 15: ...s e i n p g O Grey Yellow INSTALLATION OF THE CHROME PLATED SHAFT COVER TORQUE ADJUSTMENT by pass valves Grey Yellow Adjust the opening and closing forces of the gate so that the diagram of the force...

Страница 16: ...sured with the rod inserted into the actuator and the oil level must be at the distributor level Fig 25 OIL LEVEL DISTRIBUTOR LEVEL DISTRIBUTOR PHOTOCELLS TRANSMITTER KEY SWITCH RADIO RECEIVER FLASHIN...

Страница 17: ...Check the release system functionality Check and grease the fixation pivots Check the integrity of the connecting cables Check the good status of all the apparatus which are subject to efforts back fi...

Страница 18: ...ONSIBLE FOR ANY DAMAGE OR INJURY CAUSED BYIMPROPER USE OF THIS PRODUCT SEA reserves the right to do changes or variations that may be necessary to its products with no obligation to notice Fig 28 RISK...

Страница 19: ...ust contact SEAfor instructions WARRANTY for the original buyer only Hydraulic and oil bath motors 36 months warranty from the date of invoice on manufacturing assembling and workmanship defects Elect...

Страница 20: ...850 N W 21st unit 160 DORAL MIAMI Florida FL 33172 USA Phone 1 305 594 1151 Fax 1 305 594 7325 Toll Free 800 689 4716 web site www sea usa com e mail sales sea usa com International registered tradema...

Отзывы: