14
SUPER FULL TANK THREEPHASE - THREEPHASE CABLE CONNECTIONS
1
PHASE 1 (U)
2
PHASE 2 (V)
3
PHASE 3 (W)
4
-
5
MOTOR HEATING DETECTOR
CONTACT (NC)
6
GROUND - YELLOW-GREEN (GV)
1
2
3
4
5
6
Fig. 19
ATTENTION
It is obligatory to remove the breather screw at the end of the installation.
BREATHER SCREW
Unscrew and remove the screw under
the operator at the end of installation
Fig. 20
Fig. 22
Fig. 21