Generating set start-up
Screen
No.
Screen Data
displayed
G 6
STARTING
IN PROGRESS
24/08/2005
13:12
Operating phase - genset starting
Date and time (depending on settings)
G 7
AIR PREHEATING
10sec
24/08/2005
13:12
Operating phase - air preheating prior to genset
starting
Countdown of the air preheating delay
Date and time (depending on settings)
Generating set started
Screen
No.
Screen
Data displayed
G 8
Default
screen
AVAILABLE POWER
75%
24/08/2005
13:12
Operating phase – genset operating – stable voltage
and frequency
Available power
Date and time (depending on settings)
G 9
AUTOMATIC STOP
IN PROGRESS
LOAD SUPPRESSION
1min30
24/08/2005
13:12
Operation mode - operation in AUTO mode
Power supply device opens (motorised circuit
breaker or changeover switch controlled by the
TELYS)
Countdown of the Mains Return delay OR Test on
load delay
Date and time (depending on settings)
73/242
Содержание R33C3
Страница 2: ......
Страница 61: ...The following diagram shows the structure of the main menu and how to go to each parameter 59 242 ...
Страница 94: ...92 242 ...
Страница 95: ...10 Appendix 10 1 Appendix A Engine user and maintenance manual 93 242 ...
Страница 96: ...94 242 ...
Страница 98: ...96 242 ...
Страница 115: ...113 242 ...
Страница 135: ...133 242 ...
Страница 145: ...143 242 ...
Страница 179: ...177 242 ...
Страница 191: ...July 2009 Pub No 99610 29120 OPERATION MAINTENANCE MANUAL 189 242 ...
Страница 192: ...Printed in Japan Pub No 99610 29120 190 242 ...
Страница 193: ...10 2 Appendix B Alternator user and maintenance manual 191 242 ...
Страница 194: ...192 242 ...
Страница 196: ...194 242 ...
Страница 227: ...Installation and maintenance R250 A V R 4067 en 2009 05 b LEROY SOMER 11 225 242 ...
Страница 242: ...14 LEROY SOMER 2010 11 f Installation and maintenance R438 NOTES 3971 en 240 242 ...
Страница 243: ...LEROY SOMER 15 2010 11 f Installation and maintenance R438 NOTES 3971 en 241 242 ...