4.2.3.3.
Connecting the generating set to the installation
Risk of electric shock
.
Before use, the generating set must always be earthed. Protection against electric shocks is only effective
once the earthing connection has been made.
Disconnect the battery leads, starting with the negative lead (-), or use the battery isolating switch before
carrying out any operations on the generating set.
DANGER
1.
Open the door to the power section (no.1) then the
access door to the power connection cable router flap
and to the connection terminal box (no.2).
2.
Loosen the two knobs (no.3) of the power connection
cable router flap then slide the flap (no 4) towards the
outside of the generating set.
3.
Feed the power connection cables through the cable
router flap.
1
2
Power cables
3
3
4
46/242
Содержание R33C3
Страница 2: ......
Страница 61: ...The following diagram shows the structure of the main menu and how to go to each parameter 59 242 ...
Страница 94: ...92 242 ...
Страница 95: ...10 Appendix 10 1 Appendix A Engine user and maintenance manual 93 242 ...
Страница 96: ...94 242 ...
Страница 98: ...96 242 ...
Страница 115: ...113 242 ...
Страница 135: ...133 242 ...
Страница 145: ...143 242 ...
Страница 179: ...177 242 ...
Страница 191: ...July 2009 Pub No 99610 29120 OPERATION MAINTENANCE MANUAL 189 242 ...
Страница 192: ...Printed in Japan Pub No 99610 29120 190 242 ...
Страница 193: ...10 2 Appendix B Alternator user and maintenance manual 191 242 ...
Страница 194: ...192 242 ...
Страница 196: ...194 242 ...
Страница 227: ...Installation and maintenance R250 A V R 4067 en 2009 05 b LEROY SOMER 11 225 242 ...
Страница 242: ...14 LEROY SOMER 2010 11 f Installation and maintenance R438 NOTES 3971 en 240 242 ...
Страница 243: ...LEROY SOMER 15 2010 11 f Installation and maintenance R438 NOTES 3971 en 241 242 ...