After Utility Connections:
1. Level the cabinet, use the leg levelers on the
end of the legs to adjust the cabinet height.
2. Wash out the bin. If desired, the interior of the
bin could be sanitized.
3. Locate the ice scoop (if supplied) and have it
available for use when needed.
4. Switch on the electrical power. Do not start the
machine for 4 hours.
Final Check List:
1. Is the unit located indoors in a controlled
environment?
2. Is the unit located where it can receive adequate
cooling air?
3. Has the correct electrical power been supplied
to the machine?
4. Have all the water supply connections been
made?
5. Have all the drain connections been made?
6. Has the unit been leveled? Level the unit at the
water reservoir.
7. Have all unpacking materials been removed?
8. Is the water pressure adequate?
9. Have the drain connections been checked for
leaks?
10. Has the bin interior been wiped clean or
sanitized?
11. Have any water filter cartridges been
replaced?
12. Check all refrigerant lines and conduit lines, for
vibration or rubbing and possible failure. Adjust as
needed.
13. After 4 hours of electrical power, proceed to
Initial Start Up.
CME506R, 656R, 806R: AutoIQ Cubers
January 2000
Page 12