temperature
galvanic
17
Top hot air adjust
Control of the upper part
of a heating nozzle size
of the wind
Clockwise to
increase air flow,
counter-clockwise
18
Foot
Support and adjust
height
Elevated body
clockwise,
counterclockwise
19
Cross-flow cooling fan After cooling the PCB
heating
Choose manual or
automatic
20
Fixture slide
PCB board supporting
bar fixed
The PCB into
V-groove, moving
pallets for clamping
21
Monitor
BGA and PCB
alignment display
images
Good video,
connector plug,
power cord
5. Program settings and operation
(I) Power to prepare power on:
1. Careful check examination after installed, the switch power on.
2. Check the emergency stop button is pressed or not (Note: If emergency
stop button is pressed, the device will cut off the control power.)
(II) “Operation” Operate
1. After power on, the touch screen will be display (as Figure1) interface,
click “Operation” button, appears operation curve interface. (Figure2).
(Figure1)
Содержание ACHI-HR15000
Страница 1: ...ACHI HR15000 Rework Station NO ACHI HR 15000 Instruction Manual Shenzhen Scotle Technology Co Ltd...
Страница 6: ...4 Introduction of the main structure...
Страница 24: ...The vacuum pen is sucking the chip Laser position the red light point in the center of chip...
Страница 25: ...Optical alignment Machine testing for customers...
Страница 26: ......