(V)Transmission maintain
1. Drive screw rod must be regular clean (at least once one month) and
add lubricant oil, use dry cloth to wrap;
2. Top slider rail and optical slider rail: always keep surface clean, without
sundries. Regular (at least once one month) add lubricant oil;
3. Regular check each transmission part, if there are loose, injure and etc.
(VI)Electronic maintain
1. Always keep display and touch screen clean, use the detergent clean.
2. Regular check circuit, replace old one in time;
3. Always keep the optical system and top heater and Photoelectric
switch always avoid dusty pile up to dysfunction.
4. Regular check the leakage switch sensitivity, ensure safety.
10. Safety precautions
1. BGA rework station ACHI HR-15000 use AC220V power, working
temperature may up to 400
℃
, improper operation may cause damage
to the equipment an d even endanger the safety of the operator.
Therefore must strictly abide the following:
2. The power supplier for this machine is ~220V, the total power is
4700W; so before you use it, you have to check your power supplier is
suitable for this machine.
3. Prohibited flammable gases or liquid around the machine; After
booting, forbidden combustibles touch high temperature district and
peripheral metal parts, otherwise it will easily cause fire or explosion;
4. To avoid high temperature scald, forbidden touching high temperature
fever zone during working. PCB board still warm when completed,
operation process should take necessary protective measures;
5. PCB board should be placed on V type support shelves and used
slider pairs to support PCB board in the center;
6. Metal or angular and sharp objects are avoided on touch screen
surface;
7. Upper and lower heater inlet must not be blocked, otherwise heating
wire will be damaged;
8. After work, please guarantee natural cooling for 5 minutes, then Switch
Содержание ACHI-HR15000
Страница 1: ...ACHI HR15000 Rework Station NO ACHI HR 15000 Instruction Manual Shenzhen Scotle Technology Co Ltd...
Страница 6: ...4 Introduction of the main structure...
Страница 24: ...The vacuum pen is sucking the chip Laser position the red light point in the center of chip...
Страница 25: ...Optical alignment Machine testing for customers...
Страница 26: ......