CONTENTS
1. Instruction Features
.................................................................. 4
2. Installation
.................................................................................. 4
3. Product specifications and technical parameters
................. 5
4. Introduction of the main structure
........................................... 6
5. Program settings and operation
.............................................. 8
6. Operation Basic Introduction
................................................. 13
7. The use of external thermocouple wires
.............................. 15
8. Reballing process
.................................................................... 18
9. Repair and Maintenance
......................................................... 20
10. Safety precautions
................................................................ 21
Normal BGA welding and de-soldering parameters
(for
reference) ...................................................................................... 22
Содержание ACHI-HR15000
Страница 1: ...ACHI HR15000 Rework Station NO ACHI HR 15000 Instruction Manual Shenzhen Scotle Technology Co Ltd...
Страница 6: ...4 Introduction of the main structure...
Страница 24: ...The vacuum pen is sucking the chip Laser position the red light point in the center of chip...
Страница 25: ...Optical alignment Machine testing for customers...
Страница 26: ......