
7. Finish the alignment.
• If no adjustments are required, then the transport system is aligned. Click
Cancel
and then click
Yes
in
the message to confirm.
• If changes are required, go to step
.
8. Type the new value in the
SET X(D)
field and then click
SET X(D)
. Do the same thing for the
SET X(M)
and
SET Z
fields, and then click
Save Positions
.
A message that the EEPROM values have been saved opens.
Configure the Photomultiplier Tube (PMT) Voltage
The photomultiplier voltage must be configured when the system is installed and if the photomultiplier is replaced.
Inject a Sample and Determine the Detector Counts
Required Materials
• 12-well tube strip
• 20 µL pipette
• Calibration solution
• C100
HT
Glycan Labeling and Analysis buffer tray
1. Remove the buffer tray from the refrigerator and then allow it to stand at room temperature for at least 20
minutes before use.
2. Remove the seal from the buffer tray, put it in the buffer plate, and then put the buffer plate into the buffer
plate carrier in the C100
HT
Biologics Analyzer system.
3. Pipette 20 µL of the calibration solution into each well of a 12-well tube strip and then put it in Row A of the
sample tray. Make sure that the solution is at the bottom of the well and there are no bubbles.
4. In the C100
HT
software, click
to go to Service mode.
5. Click
Maintenance > Long Fill
and then click
Start
.
The filling process takes approximately 3 minutes.
6. Click
Terminal
and set the parameters as shown in the following figure.
Installation Guide
C100
HT
Biologics Analyzer System
RUO-IDV-09-3829-A
18 / 31
Installation Instructions