Assembly and installation
40
3.00 | PRH | Assembly and Operating Manual | en | 389327
When using a customer-specific solution to bridge PIN DEFAULT
and GND:
Ø
Turn off the voltage supply.
Ø
Bridge PIN DEFAULT (PIN 12) and PIN GND (PIN 2) on the 12-pin
M12 connector socket S4.
Ø
Turn on the voltage supply again.
Ø
Remove the jumper again.
✔
DEFAULT values are set on the product,
Loading new
firmware to the
module
The product can be described with a new firmware using the
software "Motion Tool SCHUNK (MTS)" (included on the DVD
supplied) using the 'Module' function - 'Update firmware’.
NOTE
The software handbook "Motion Control SCHUNK" contains more
information.
5.4 Handling after switching on
NOTE
Each time the drive is restarted, it moves slightly in positive and
negative direction (approx. 1°). The is due to the vector search
and the Hall sensor scanning.
• Before referencing, ensure that the product is not blocked or
positioned on end stop.
5.5 "Endless turning" application
If in applications more than 10 full revolutions in one direction are
to be carried out, the position must regularly be reset to "0".
To do so, trigger the reference command. The module will then
carry out the selected reference run and reset the position to"0°"
accordingly.
NOTE
In order to not delay the handling process, select the reference
type "none" and trigger the reference command. The current
position is then used as a new "0" position.
The software handbook "Motion Control Schunk" contains further
information on the reference command.