Start of Operations
7 Start of Operations
7.1 Personnel Qualification
Unqualified personnel cannot recognize dangers and are therefore
exposed to higher risks!
1. Only instruct qualified personnel to perform the tasks
described in these operating instructions.
2. The product may only be operated by persons who have
undergone appropriate training.
3. Electrical work and installations may only be carried out by
qualified electrical specialists.
4. Assembly and maintenance work must only be carried out by
qualified personnel.
7.2 Before Initial Start of Operations
Before the initial start of operations following installation, repair,
servicing or maintenance work, you must check the following:
• All mechanical connectors are properly attached and secured.
• All screws and nuts are tightened to specified torques.
• All components are installed.
• The safety distances have been maintained.
• The electrical cable and supply hoses are properly routed.
• The EMERGENCY STOP switch for the overall system is working.
CAUTION
Noise pollution due to incorrect installation of the pressure and
vacuum connections
Hearing damage
•
Correct installation.
•
Wear ear protectors.
CAUTION
Vacuum close to the eye
Severe eye injury!
•
Wear eye protection.
•
Do not look into vacuum openings, e.g. suction cups.
19
01 | Matrix-Plate SMPL | Assembly- and Operating Manual | en-US | 0489081
Содержание 1487754
Страница 1: ...Translation of the original manual Assembly and Operating Manual Matrix Plate SMPL ...
Страница 38: ......
Страница 39: ......