Schmidt
Mess- und Regeltechnik
©2014 Schmidt
Mess- und Regeltechnik
Fon 0 67 32 - 91 91 20 Fax 0 67 32 - 96 24 42 [email protected]
8
•
Maintenance measures are to be executed only by qualified persons.
•
The exchange of components is only allowed with original spare parts which are also made
accessible for the use in the ex-area, this is also valid for possible use of lubrication and
assistance materials.
•
The devices are to be cleaned and maintained regularly in the ex-area. The intervals are
determined by the operator in accordance with environmental claims.
•
After service and/or maintenance all removed barriers and advices must be attached in the initial
position.
Activity
Visual
examination
daily
Visual
examination
monthly
Proximity
examination
every 3
months or
2000 h
Detailed
examination
every 6 months
or 4000 h
1
Visual control of the
devices, disposal of dust
●
2
Device in general
●
3
Examination of the plant
for leaking
●
Special measures:
•
Observance of the operation manual of the delivered construction groups
•
Realization of the manufacturer’s conditions
8.7 Troubleshooting
It is not allowed to make changes on devices operated in explosion endangered areas. Only
legitimate technical personnel trained specially for this are authorized to carry out repairs on the
device.
8.8 Waste disposal
The disposal of packaging and used parts has to take place in accordance with the country’s
regulations where the device is installed.
Close inspection
:
An examination to identify such defects as e.g. loose screws which are only
discernible by using access installations like a step or tools, in addition to the aspects of the visual
examination. Usually, there is no need of opening the housing or switch-
off the equipment’s voltage.
Detailed examination:
An examination additionally to the aspects of the close inspection in order to
discover such defects as e.g. loose connections which are only discernible by opening housings and/or,
if necessary, using tools and testing facilities.
Operation Manual
Flowmeter / Flow Control DW-U
Flow monitor after the baffle plate principle for liquids