background image

Schmidt 

Mess- und Regeltechnik

 

©2014 Schmidt 

Mess- und Regeltechnik

  

Fon 0 67 32 - 91 91 20        Fax 0 67 32 - 96 24 42        [email protected] 

Only experts may operate the devices. 

Fasteners are to be re-attached after opening. 

The operation of the device is permitted only with entirely mounted and undamaged housing. 

The potential equalisation is connected with its own screw on the metallic pipe system. 
National regulations have to be taken into consideration. 

The devices have to be protected against ingress of liquids and dirt. 

The devices mainly consist of stainless steel and brass. External impacts should be avoided. 

During operation the device may only be exposed to minor vibrations. Please ask the supplier 
if you are not sure.  

 
8.5  Range of use 

The devices are approved only for appropriate use as directed. Non-compliance voids any 
claim on warranty and responsibility of the manufacturer!  

Only those equipment parts which fulfil all demands of the European guidelines and national 
legislation are allowed to be used in explosion endangered areas. 

The specified ambient conditions stated in the operation manual must be strictly adhered to. 

The devices are suitable for use in normal industrial atmospheres. If there are any aggressive 
substances in the air the manufacturer has to be consulted implicitly. 

Sticking parts, e.g. due to corrosion, are not allowed to be removed violently in an EX-
atmosphere. 

Protection measures against lightning are to be ensured by the operator.

 

 

8.6  Repair and maintenance 
 

Definition of terms according to IEC 60079-17: 

 

Service and repair

: A combination of all activities that are carried out in order to keep an 

object in a condition or to repair it, that it meets the demands of the corresponding 
specification and that guarantees the execution of the required functions. 

 

Inspection

:

 An occupation which includes the careful examination of an object in order to get a 

reliable statement about the condition of this object. This activity is carried out without 
dismantling or, if necessary, with partly dismantling, completed by measures as e.g. 
measuring. 

 

Visual examination

: A visual examination is an examination to locate viewable defects, e.g. 

missing screws, without the use of access installations or tools. 

 

 

HENKE SASS WOLF GMBH 

 

Further important facts: 

8.4    Installation and operation

 

 

The devices have to be installed in a higher-level assembly. Depending on the degree of IP 
protection, the time of cleaning the device (dust deposit) has to be defined. It is important to 
ensure that only the device ignition protection class according to the corresponding zone is 
installed! It is imperative to adhere to valid national device regulations (for example EN  60079-
14) during installation. 

Operation Manual 
Flowmeter / Flow Control DW-U 

 

Flow monitor after the baffle plate principle for liquids 

Содержание DW-U

Страница 1: ... for liquids Easy switch point adjustment in small scale steps Compulsive motion transfer to a micro switch Hermetic separation from the medium by means of bellows High power handling capacity Insensitive to magnetic fields High resistance to dirt and high operational safety Available for all flow directions Very economical monitoring of large pipes Output signal 0 4 20 mA for type DW U AN Without...

Страница 2: ...Switches and Flow Meters are to be installed directly into a pipe system Make sure that the instruments are installed according to the information given on the type plate The flow direction correlates to the direction of the pipe Inaccuracy of the instrument will result from incorrect mounting 3 2 Flow direction Due to the applied measuring principle the devices are functional only if for the inst...

Страница 3: ...edure arrow All pipes must be free of contaminants 3 4 2 Threaded connection The tube is directly connected to the unit We recommend sealing all threads with PTFE sealing tape Ensure that no excess of tape is left protruding into the pipe 3 4 3 Flange connection With a flange connection the sealing takes place between the device and flange by means of a suitable flat gasket to be provided by the c...

Страница 4: ...ing The max switching capacity is 230V 5A AC 4 2 Connecting Type DW U and DW N Removing the device cover allows access to the four pole terminal block In addition to the micro switch a control lamp is installed This lamp is for optical control of the switch status of the micro switch The required lamp voltage is indicated on the label The max switching capacity is 230V 10A AC Please connect the de...

Страница 5: ...s indicated on the small scale attached on the backside The actual flow is indicated on the large round scale at the front of the unit 7 Maintenance The Paddle Flow Switch Flow Meter DW U are virtually maintenance free In case of mal function first of all check the pipe system for calcification or contaminations For cleaning do not use sharp edged tools and proceed with extreme caution Damaged ins...

Страница 6: ... d In Zone 21 Dust Ex Category 2D at dusts with minimum ignition energy MIE 3 mJ e Usually there is no zone within the measuring tube Here Zone 1 may be set as maximum The qualification regarding the surface temperature is T4 for all gases vapours mists with an ignition temperature 125 C the mentioned devices are no ignition source In the dust EX category the reference temperature is 110 C Other m...

Страница 7: ...ed implicitly Sticking parts e g due to corrosion are not allowed to be removed violently in an EX atmosphere Protection measures against lightning are to be ensured by the operator 8 6 Repair and maintenance Definition of terms according to IEC 60079 17 Service and repair A combination of all activities that are carried out in order to keep an object in a condition or to repair it that it meets t...

Страница 8: ...easures Observance of the operation manual of the delivered construction groups Realization of the manufacturer s conditions 8 7 Troubleshooting It is not allowed to make changes on devices operated in explosion endangered areas Only legitimate technical personnel trained specially for this are authorized to carry out repairs on the device 8 8 Waste disposal The disposal of packaging and used part...

Отзывы: