background image

www.scheer-heizsysteme.de

heater to move®

   general operating instructions

CE marking Corresponding to existing 
EC directives

Technical changes reserved!

      tested safety

      transport and storage

• 

Do 

not

 

lift

 and 

lash

 the device by the 

fittings

• 

The device must be stored 

dry, dust-protected

 and 

frost-free

• 

Disconnect

 from 

power source

 for storage

• 

Store only when

 completely emptied

This ensures that no damage is caused to the device during transport or storage

      assembly

• 

In 

outdoor

 areas� level and stable ground must be ensured

• 

Lock

 the brakes to prevent rolling away

Disposal of old equipment

At the end of its service life the device has to be disposed of in accordance with national regulations. 

It is recommended to contact a company specializing in waste disposal or contacting the disposal 

department of your commune.

WARNING!

To prevent misuse and the associated dangers� make your old equipment unusable before disposal. There-

for disconnect the device from the power supply and remove the power cable from the device. To dispose 

the device� observe the regulations applicable in your country and in your commune.

WARNING!

Danger due to electrical current!

The device may only be operated on properly installed single sockets with protective contact.

Do not disconnect the mains cable from socket by pulling the cable� always touch the housing of 

the mains plug.

The MH-heating systems are approved for the use of  „diesel“ and  „heating oil“. Any other type of fuel for 

operating have to be in advance approved by the manufacturer SCHEER. The heaters are designed for 230 Volts.

The connection in the vehicle has to be fed from the battery of the vehicle via an inverter approved in road traf-

fic within the scope of the ECE Regulation. Alternatively� the heater can also be done via a 230V direct supply 

(for example: direct supply of the campsite).

9

 

 

 

 

 

 

 

 

Содержание heater to move

Страница 1: ...revised 06 2019 innovative heat systems user s instructions heater to move MH 5 MH 10...

Страница 2: ...eration over the boiler control field are very efficient and environmentally friendly We hope that how to use the heating system and all of its functions are explained to you to your full satisfaction...

Страница 3: ...ta boiler boiler dimensions warning and safety signs definition warning and safety signs general operating instructions transport storage and assembly commissioning filling and venting boiler setting...

Страница 4: ...d with SCHEER precision spring technology in the nozzle block Blautherm DUO BE burner type Blaubrenner with start level fuel Heating oil EL according to DIN 51603 power kW 17 oil pump AL V 35C oil noz...

Страница 5: ...put kW 19 CE label according to oil equipment directive CE 0045CMKD 2340 Permissible flow temperature safety temperature C 95 Permissible operating pressure bar 3 heating gas side resistance mbar 0 30...

Страница 6: ...Regelung Verbrennungsschutz Abgasrohr Vorlauf R cklaufanschluss Bef ll und Ablasshahn Leergewicht gesamt 110 Kg Ausdehnungsgef Rahmenkonstruktion aus 30x30 Vierkantrohr Elektronische Regelung Kesselu...

Страница 7: ...R Death or serious injury by suffocation see also next page classification of the signal word according to ANSI Z535 4 signal word identification of hazard NOTICE Notice this header is preferred to ad...

Страница 8: ...The heating system must be turned off before you get fuel at gas stations The year of the first start up must be permanently marked on the identification plate Make sure all existing shut off valves o...

Страница 9: ...ARNING To prevent misuse and the associated dangers make your old equipment unusable before disposal There for disconnect the device from the power supply and remove the power cable from the device To...

Страница 10: ...se if necessary filling and venting Fill up the system via the filling device on the top side Monitoring the fill level indicator during the filling process Fill the unit with water via the on site sy...

Страница 11: ...a ture Use the arrow buttons to set the desired target temperature and confirm with the P but ton SP and the set target temperature light up alternately again Press the P button to display the boiler...

Страница 12: ...a tic circuit breakers in the device and in the on site distributor check whether the system is switched on at low pressure top up with water If the pressure is too high Drain water check oil filter f...

Страница 13: ...ing damage burner goes into malfunction at irregular intervals coupling defective oil pump or engine running heavily ignition transformer stops IRD no longer takes over relief check fuse set thermosta...

Страница 14: ...ng activating deactivating and diagnos tics The multi color signal lamp behind the clear cover of the lockout reset button is the key indicating compo nent for visual diagnostics and interface diagnos...

Страница 15: ...ion and console With integrated sack truck to facilitate transport The air heater is equipped with a thermostat The connection between air heater and heater to move is made with a flow return flow hos...

Страница 16: ...teme de SCHEER Heizsysteme Produktionstechnik GmbH Chausseestr 16 D 25797 W hrden Tel 49 0 4839 905 0 Fax 49 0 4839 453 info scheer heizsysteme de www scheer heizsysteme de best in convenience and com...

Отзывы: