commissioning
•
Connect the connecting pipes for return flow (blue) and flow (red) to the on-site heating system
•
Check whether the ball valves with a thermometer handle are closed
•
Close if necessary
filling and venting
•
Fill up the system via the filling device on the top side.
Monitoring the fill level indicator during the filling process
•
Fill the unit with water via the on-site system or fill level filler.
Recommended operating pressure: 1.5-2 bar
return flow
flow
•
Open the ball valves on the flow and return flow.
If possible� fill the system at the lowest point so that the air can
escape upwards