3. Place the boom rail and operator assembly centrally on the garage floor with the operator opposite the garage
door. Lift the front of the rail up to the door bracket. Insert the pivot pin and secure it with the split pin supplied.
4. Lift and support the operator with a ladder so it is positioned centrally and level.
WARNING:
Do not allow children around the door, opener or supporting ladder -- serious injury and/or
damage may result from failure to follow this warning.
5. With the boom rail securely positioned on your ladder, attach the Easy-Click bracket to the ceiling mounted
extension pieces with the nuts, washers, and bolts provided.
Figure 15
Figure 16
Figure 17
6. Now slide the shuttle to the front of the rail with the garage door closed. Attach the curved arm to the
shuttle and to the door leaf bracket.
7. Lift the garage door until the shuttle locks into the drive chain/belt. The operator is now ready to be
programmed.
Figure 18
Figure 19
34