Operating and maintenance instructions
Electrical connection
Version 1.0
Page 27 of 56
Proceed in the order given:
Step
Procedure
1
Connect the terminals (item 3).
2
Before mounting the cover, clean the sealing surfaces (item 4).
3
Do not twist, damage or bend the silicone seal or the O-ring (item 5) when
mounting the cover.
5.2.3 Connection example to comply with protection class IP6K9K
The connections are standard connections.
Details on drawings have priority.
Example
Item
Designation
1
Molex plug
2
Screw tightening torque: M6 max. 13 Nm
3
Potential equalisation screw, tightening torque: M8 max. 21 Nm