![Satec PM135E Скачать руководство пользователя страница 67](http://html.mh-extra.com/html/satec/pm135e/pm135e_installation-and-operation-manual_1200373067.webp)
Chapter 4 Using PAS Software
Setting Up the Meter
PM135 Powermeter Series
67
connection before announcing an
error.
Figure
4-4: Configuration Dialog Box – Connection Tab
6.
In the
Retries
box, specify the
number of retries PAS will use to
receive a response from the meter if
communications fail.
7.
Click
OK
.
4.4
Setting Up the Meter
Preparing Setups for the Meter
PAS allows you to prepare setup data for your meter off-line without the
need to have it connected to your PC.
To prepare a setup for your meter:
1.
Select the device site from the list
box on the PAS toolbar.
2.
Select the desired setup group from
the
Meter Setup
menu. Click on
the tab with the setup you want to
create or modify.
3.
Fill in the boxes with the desired
configuration data for your meter.
4.
Click the
Save as…
button to store
the data to the meter site database.
5.
Click
OK
.
Always set up and store the Basic Setup data to the site
database first. PAS uses this data as a reference when
arranging other meter setups.
To save your setup to another site database:
1.
Click the
Save as…
button.