background image

 

 

 

 

No. 

Parameter 

Unit 

SAS MULTI 

1. 

Boiler power  

kW 

17 

23 

29 

36 

42 

48 

2. 

Boiler heated surface 

m

2

 

1.5 

2.0 

2.5 

3.0 

3.5 

4.0 

3. 

Boiler efficiency 

%

 

80,4 ÷ 85,2 

4. 

Fuel consumpcion* 

kg/h 

1,1 

1,9 

2,5 

3,0 

3,6 

4,1 

5. 

Load chamber capacity 

dm

3

 

kg 

120 
~90 

150 

~110 

170 

~125 

170 

         ~125 

200 

~150 

240 

~170 

6. 

Boiler water capicity 

85 

105 

115 

125 

145 

175 

7. 

Boiler weight (without water) 

kg 

420 

550 

590 

630 

670 

730 

8. 

Required chimney draught 

mbar 

0,30 

0,45 

9. 

Exhaust temperature 

°C 

90 ÷ 210 

10.  Recommended heating water working temp. 

°C 

60 ÷ 80 

11.  Maximal allowable working temperature 

°C 

85 

12.  Maximal allowable operating pressure 

bar 

1,5 

13.  Minimal return water temp.** 

°C 

55 

14.  Power supply 

V/Hz 

~230 / 50 

15.  Power consumption 

to 180 

16. 

Boiler dimensions 

mm 

1140 

1140 

1160 

1160 

1200 

1280 

A1 

mm 

290 

290 

305 

305 

330 

330 

mm 

1110 

1235 

1235 

1300 

1300 

1300 

B1 

mm 

450 

535 

535 

605 

605 

605 

mm 

1430 

1430 

1490 

1490 

1590 

1590 

H1 

mm 

1300 

1300 

1375 

1375 

1475 

1475 

H2 

mm 

980 

980 

1050 

1050 

1120 

1120 

H3 

mm 

150 

150 

150 

150 

150 

150 

Combustion chamber dimensions 

mm 

330 

330 

330 

330 

330 

410 

mm 

260 

260 

300 

300 

400 

400 

17.  Smoke conduit diameter    

mm 

Ø 180 

Ø 180 

Ø 200 

Ø 200 

Ø 220 

Ø 220 

18.  Connector pipe diameter (supply/return) 

G 1½ 

G 2 

19.  Min. chimney height 

20.  Minimal chimney dimensions/diameter 

cmxcm 

mm 

18x18 

Ø 210 

20x20 

Ø 220 

21x21 

Ø 240 

22x22 

Ø 250 

25x25 

Ø 280 

25x25 

Ø 280 

*    

 when working at average load (50% of rated power)/ rated load

 

**    if manufacturer recommendations regarding heating water temperature ranges are not observed, boiler must be obligatory connected  to central heating system equipped with 

three- or four – ways valve, protecting against so called „ low temperatures corrosion”    

TECHNICAL AND OPERATING PARAMETERS OF SAS MULTI BOILER

 

 

Содержание MULTI Series

Страница 1: ...M E T A L O W O K O T L A R S K I 28 100 Busko Zdr j Owczary ul Przemys owa 3 Phone 48 41 378 46 19 Fax 48 41 370 83 10 TECHNICAL START UP DOCUMENTATION of water boilers for heating installations SAS...

Страница 2: ...tallation 15 6 Operation and exploitation guidelines 16 6 1 Filling with water 16 6 2 Firing up and functioning of a boiler 16 6 2 1 Firing up and functioning of a boiler in automatic mode 17 6 2 2 Fi...

Страница 3: ...3...

Страница 4: ...ater temperature does not exceed 85 C and working pressure does not exceed 1 5 bar Required gases draught pressure after a boiler is 0 30 0 45 mbar depending on boiler s power These boilers may also w...

Страница 5: ...in the temperature set on the controller The controller constantly measures the temperature of water boiler Depending on the results it controls fuel feeder and ventilator At the same time the control...

Страница 6: ...arge cleaning door pos 6 furnace door pos 11 and ash box door pos 13 are placed on the boiler s front For periodic cleaning operations and also for firing up a boiler the retort may be accessed throug...

Страница 7: ...1200 1280 A1 mm 290 290 305 305 330 330 B mm 1110 1235 1235 1300 1300 1300 B1 mm 450 535 535 605 605 605 H mm 1430 1430 1490 1490 1590 1590 H1 mm 1300 1300 1375 1375 1475 1475 H2 mm 980 980 1050 1050...

Страница 8: ...door 14 air intake dosage flap 15 air draft regulator 16 connecting strip 17 hot water connector pipe 18 upper washout hole cover 19 smoke conduit clearing hole 20 smoke throttle 21 smoke conduit 22...

Страница 9: ...tent to 10 Ash melting temperature 1150 C Low coal swelling coal should not tend to stick when burner Volatile particles content 30 40 It is recommended to use coal which is prone to agglomeration cok...

Страница 10: ...allation shall be installed must conform the requirements of detailed regulations being in force at the country of destination e g PN 87 B 02411 In particular the following requirements shall be fulfi...

Страница 11: ...k draught may also cause or help in carbon black forming which is then settling down on the boiler s convection channels If the draught is too strong it will cause excessive air to draw into the retor...

Страница 12: ...system provided with three or four pass valve The main advantage of such connection is boiler protection function against low temperature corrosion preventing it from premature wear If not satisfacto...

Страница 13: ...d down 6 2 FIRING UP AND OPERATE A BOILER Before fuel fire up it is mandatory to check installation filling with water Water can t be frozen It must be checked also if there is no water leakage on boi...

Страница 14: ...as varying fuel quality may cause the boiler to burn out If the fire is out during up phase the furnace should be cleaned and boiler s channels ventilated and the whole starting procedure must be rep...

Страница 15: ...ve At the same time the controller operates the heating system circulation pump if such is provided Heat requirement in the heat installation is varying due to changing outdoor conditions such as the...

Страница 16: ...t those adverse phenomena should go away During normal exploitation of boiler in the traditional combustion mode burning process is based on periodic refueling Single load of basic fuel is sufficient...

Страница 17: ...of burned fuel and apply cleaning and conservation of the entire boiler Pay special attention to lubricate inner partitions of combustion chamber and all movable elements with oil For the period of br...

Страница 18: ...ection channels walls disrupts proper heat transfer from the exchanger lowering this way an efficiency of device and increases fuel consumption 6 6 OPERATE AND MAINTENACE OF A FEEDER AND RETORT Feeder...

Страница 19: ...nstallation improper functioning of controller or fan adjust controller s settings up to weather conditions or quality of fuel mainly feeder operation time and fuel delivery pauses should be changed t...

Страница 20: ...oal reduce the set of fuel supply by 5 10 or increase blow in power Wait 20 30 minutes until such changes come to effect what should be deflected in change of fire state In order to ensure the failure...

Страница 21: ...arried out by authorized team Before connecting a boiler to a heating installation make check if all boiler s components are in good working condition and that the boiler is fully equipped NOTE Boiler...

Страница 22: ...on alterations made by user or other third parties will cause the warranty to be invalid 8 Application of reclamation should be addressed at manufacturer 9 Boiler replacement realized by manufacturer...

Страница 23: ...umentation however basic described properties of the product shall be maintained Any remarks and questions on boiler s SAS type exploitation shall be addressed ZAK AD METALOWO KOTLARSKI Owczary ul Prz...

Страница 24: ...24 SERVICE REPAIRS...

Страница 25: ...25 SERVICE REPAIRS...

Страница 26: ...perature boiler of SAS MULTI type installed and operated in pursuance of Technical Start Up Documentation Boiler no Heating capacity Heated surface Year of manufacture Manufacturer signature and stamp...

Отзывы: