background image

 

 

 

- 12 - 

 

For boiler to be used, it is not required to apply flue insert, however in year 

round exploitation – it is recommended to provide heating to the hot utility 

water container. 

 

5.4. CONNECTING BOILER TO HEATING INSTALLATION

  

 

The  boiler  should    be    connected  to    heat  in  installation  with  screw  connectors.   
Protecting  measures  for  water  heating  installations  of  opened  type  should  be 
according to detailed regulations being in force in the country of destination (e.g.PN-
91/B-02413).  
Volume of pressure vessel should be equal at least 4% volume o water in the entire 
heating installation. 
NOTE:  Ascending  and  descending safety  pipe  as  well  as  circulation pipe  
must    not    be    equipped  with  any  valves.  In  addition,  those  pipes  and  the 
pressure vessel should be protected against freezing. 
 
Boilers of SAS MULTI type may work with gravitational or forced water circulation. If 
installation  is  provided  with  circulation  pump,  than  on  feeding/return  pipe  the 
differential valve should be installed. When blackout or pump malfunction occurs, this 
valve will open  and the system start work running by gravitation. 
 
NOTE:  It    is    recommended    to    connect    the    boiler    to    heating    system  
provided    with    three-    or    four-pass  valve.    The    main    advantage    of    such  
connection  is  boiler  protection  function  against  low  temperature corrosion, 
preventing it from premature wear. 

 

If  not satisfactory  to  comply with manufacturer’s recommendations  in reference  to  
maintaining  given  heating water temperature ranges occurs (table  TECHNICAL – 
EXPLOITATION  PARAMETERS  p.  7,  point  13,  it concerns  in  particular  long-
lasting    return  water  temperature    below    55°C),  then  the  boiler  should  

 

be  connected    to    the    heating    installation    equipped    with        three-    or    four-pass  
valve  protecting  it  against  low temperature corrosion.

 

 

 

5.5. CONNECTING BOILER TO ELECTRICAL INSTALLATION 

Boiler  room  should  be  equipped  with  electrical  installation  230V/50Hz  should  
be  according  to  detailed regulations being in force in the country of destination. 
Electric  socked  should  be  earthed.  Grounding  functionality  should  be  checked. 
Cable  extensions  are forbidden.  Faulty  installation  may  cause the controller  to be  
destroyed   or be  unsafe for the user. Controller and  other cooperating devices are 
powered with 230 V,  therefore all connections shell be made  by qualified personnel 
(certified electrician).  
Electrical    cables    of    powered    devices    should    be    placed    away    from    boiler’s  
parts,    which    tend    to    be    hot  during  exploitation  of  boiler  (cover  of  the  upper 
washout hole, smoke conduit, door)

 

 

Содержание MULTI Series

Страница 1: ...M E T A L O W O K O T L A R S K I 28 100 Busko Zdr j Owczary ul Przemys owa 3 Phone 48 41 378 46 19 Fax 48 41 370 83 10 TECHNICAL START UP DOCUMENTATION of water boilers for heating installations SAS...

Страница 2: ...tallation 15 6 Operation and exploitation guidelines 16 6 1 Filling with water 16 6 2 Firing up and functioning of a boiler 16 6 2 1 Firing up and functioning of a boiler in automatic mode 17 6 2 2 Fi...

Страница 3: ...3...

Страница 4: ...ater temperature does not exceed 85 C and working pressure does not exceed 1 5 bar Required gases draught pressure after a boiler is 0 30 0 45 mbar depending on boiler s power These boilers may also w...

Страница 5: ...in the temperature set on the controller The controller constantly measures the temperature of water boiler Depending on the results it controls fuel feeder and ventilator At the same time the control...

Страница 6: ...arge cleaning door pos 6 furnace door pos 11 and ash box door pos 13 are placed on the boiler s front For periodic cleaning operations and also for firing up a boiler the retort may be accessed throug...

Страница 7: ...1200 1280 A1 mm 290 290 305 305 330 330 B mm 1110 1235 1235 1300 1300 1300 B1 mm 450 535 535 605 605 605 H mm 1430 1430 1490 1490 1590 1590 H1 mm 1300 1300 1375 1375 1475 1475 H2 mm 980 980 1050 1050...

Страница 8: ...door 14 air intake dosage flap 15 air draft regulator 16 connecting strip 17 hot water connector pipe 18 upper washout hole cover 19 smoke conduit clearing hole 20 smoke throttle 21 smoke conduit 22...

Страница 9: ...tent to 10 Ash melting temperature 1150 C Low coal swelling coal should not tend to stick when burner Volatile particles content 30 40 It is recommended to use coal which is prone to agglomeration cok...

Страница 10: ...allation shall be installed must conform the requirements of detailed regulations being in force at the country of destination e g PN 87 B 02411 In particular the following requirements shall be fulfi...

Страница 11: ...k draught may also cause or help in carbon black forming which is then settling down on the boiler s convection channels If the draught is too strong it will cause excessive air to draw into the retor...

Страница 12: ...system provided with three or four pass valve The main advantage of such connection is boiler protection function against low temperature corrosion preventing it from premature wear If not satisfacto...

Страница 13: ...d down 6 2 FIRING UP AND OPERATE A BOILER Before fuel fire up it is mandatory to check installation filling with water Water can t be frozen It must be checked also if there is no water leakage on boi...

Страница 14: ...as varying fuel quality may cause the boiler to burn out If the fire is out during up phase the furnace should be cleaned and boiler s channels ventilated and the whole starting procedure must be rep...

Страница 15: ...ve At the same time the controller operates the heating system circulation pump if such is provided Heat requirement in the heat installation is varying due to changing outdoor conditions such as the...

Страница 16: ...t those adverse phenomena should go away During normal exploitation of boiler in the traditional combustion mode burning process is based on periodic refueling Single load of basic fuel is sufficient...

Страница 17: ...of burned fuel and apply cleaning and conservation of the entire boiler Pay special attention to lubricate inner partitions of combustion chamber and all movable elements with oil For the period of br...

Страница 18: ...ection channels walls disrupts proper heat transfer from the exchanger lowering this way an efficiency of device and increases fuel consumption 6 6 OPERATE AND MAINTENACE OF A FEEDER AND RETORT Feeder...

Страница 19: ...nstallation improper functioning of controller or fan adjust controller s settings up to weather conditions or quality of fuel mainly feeder operation time and fuel delivery pauses should be changed t...

Страница 20: ...oal reduce the set of fuel supply by 5 10 or increase blow in power Wait 20 30 minutes until such changes come to effect what should be deflected in change of fire state In order to ensure the failure...

Страница 21: ...arried out by authorized team Before connecting a boiler to a heating installation make check if all boiler s components are in good working condition and that the boiler is fully equipped NOTE Boiler...

Страница 22: ...on alterations made by user or other third parties will cause the warranty to be invalid 8 Application of reclamation should be addressed at manufacturer 9 Boiler replacement realized by manufacturer...

Страница 23: ...umentation however basic described properties of the product shall be maintained Any remarks and questions on boiler s SAS type exploitation shall be addressed ZAK AD METALOWO KOTLARSKI Owczary ul Prz...

Страница 24: ...24 SERVICE REPAIRS...

Страница 25: ...25 SERVICE REPAIRS...

Страница 26: ...perature boiler of SAS MULTI type installed and operated in pursuance of Technical Start Up Documentation Boiler no Heating capacity Heated surface Year of manufacture Manufacturer signature and stamp...

Отзывы: