![Sapling SAP Series Скачать руководство пользователя страница 42](http://html1.mh-extra.com/html/sapling/sap-series/sap-series_installation-manual_1198738042.webp)
1 2
3 4
42
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Flag Mount Installation - Square Clock
1) Install the double gang box in the wall or ceiling.
If you are installing the gang box in the wall, leave
at least eleven inches between the top of the
gang box and the ceiling. If you are installing the
gang box in the ceiling, leave at least eleven inches
between the gang box and the wall. The box should
be installed level and plumb with the wall
and ceiling.
3) Detach the mounting plate from the mounting
pole by unscrewing the two screws. Set the screws
and pole aside for later.
4) Attach the mounting plate to the gang box using
only two of the four long, silver #6-32x1 screws.
With the mounting plate as a guide, use the pencil
to trace the locations of the four larger holes at the
outer corners.
Ceiling
11” Minimum
2) Run a CAT5 or CAT6 patch cable from a PoE
switch or PoE injector to the gang box. Confirm that
the switch or injector, as well as the master clock,
are connected to your network router.
KNOW YOUR NETWORK
Make sure that your network firewall is set to
allow communication between the clocks and
NTP servers. This means that Ports 80, 123,
and 1777 must be open.