![Sapling SAP Series Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/sapling/sap-series/sap-series_installation-manual_1198738014.webp)
1 2
3 4
14
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Wall Mount Installation - Round Metal Clock
1) Install the single gang box in the wall. Leave at
least 17 inches between the bottom of the gang
box and ceiling. Confirm that the bottom of the
gang box is level with the floor.
3) Use the #6-32x1/2 screws to attach the mounting
bracket to the gang box. The gang box should be at
the bottom of the mounting piece.
17” Minimum
43.2 cm
2) Run a CAT5 or CAT6 patch cable from a PoE
switch or PoE injector to the gang box. Confirm that
the switch or injector, as well as the master clock,
are connected to your network router.
4) Use the pencil to mark the location of the large,
circular hole at the top of the mounting bracket.
Once finished, remove the mounting piece and drill
a hole at the location you just marked.
KNOW YOUR NETWORK
Make sure that your network firewall is set to
allow communication between the clocks and
NTP servers. This means that Ports 80, 123,
and 1777 must be open.