![Sapling SAP Series Скачать руководство пользователя страница 41](http://html1.mh-extra.com/html/sapling/sap-series/sap-series_installation-manual_1198738041.webp)
41
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Dual-mount pole, including
mounting plate.
#8-32x7/16 screw
M3.5-1.0x10 screw (black)
Internal-tooth washer
#10-32x3/8 green screw
1
8
(4 used)
4
(not used)
8
(4 used)
1
Flag Mount Installation - Square Clock
Description
SAP square analog clock
Quantity
1
Picture
Included in Package
Included in Pole Kit (SAB-4GD-00S-0 or SAB-1GD-00S-0)
PLEASE NOTE:
A user will also have to provide a Phillips-head screwdriver, a small slot-head screwdriver, a drill with a 1/4 inch drill bit, a pencil, a double
gang box, four wall anchors (must support 50 lbs, #8 screw size, 1.5”(3.8cm) screw length), four #8 screws for the wall anchors, four #6-32x1 screws for
attaching the mounting plate to the gang box, any equipment needed to install the gang box, at least one CAT5 or CAT6 patch cable, and any additional
network cables or devices needed to provide Power over Ethernet, and a connection to an NTP server.
If any of the items listed in the kits are missing, you may contact your dealer and order a replacement kit.
Complete the section “Preparing to Install” before mounting the clock on the wall.
Included in Wiring Kit (A-WK-MTG-1)
#8x1.5 Self-tapping screw
Wall anchor
2
(not used)
2
(not used)
Included in Gang Box Kit (A-GB-MK-1)
#6-32x1 screw
#6-19x3/8 screw
2
1
(not used)