Preparation Before Operation
26
Buzzer: Beep-beep, beep-beep, beep-beep…
After 5 seconds elapse, the state becomes as shown below.
Buzzer: Stopped
When the UPS is working properly, the buzzer sound, LCD display, and LED state will be as
indicated in steps
⑤
and
⑥
.
⑤
Set
MAIN MCCB
to “OFF.”
⑥
Set
MAIN MCCB
to “ON.”
Check the possible causes and counter measures in the table below, and then conduct the power outage
simulation test again from step
①
.
Possible Cause
Countermeasure
Are both battery packs installed properly?
Check that two battery packs and b
attery pack securing
bracket
are installed properly.
⇒
See No.
③
and
④
in §5.1 “UPS” to confirm position
of the battery packs and b
attery pack securing bracket.
Is the forced bypass switch
Forced Bypass
set to the “
Bypass
” side?
Set the switch to the “Inverter” side.
⇒
Step
⑥
of §6.2 “Attaching LCD Panel”
Is “Green
OUTPUT
” off?
Perform the ON operation properly.
⇒
Steps
②
and
③
of §7.3 “Power Outage Simulation
Test”
Are “Red
ALARM
” and “Red
WARNING
” on?
Contact your supplier or SANYO DENKI.
Contact your supplier or SANYO DENKI when “Red ALARM” and “Red WARNING” are on or when the
UPS does not operate properly even if you perform the corresponding countermeasure above.
This completes the power outage simulation test.
When the power outage simulation test does not finish properly
Green: Lit
Green: Blinking
Green: Lit
Red: Off
Green: Blinking Green:Lit Red:Off
⑤
Set this to “OFF.”
⑦
Check that the UPS operates properly.
Green: Lit
Green: Lit
Green: Lit
Red: Off
- ONLINE
****
- BATTERY
****
⑥
Set this to “ON”
Green: Lit Green: Off Red: Off
Содержание SANUPS A11J
Страница 1: ...M0009237 5 kVA Instruction Manual ...
Страница 25: ...Installation and Wiring 22 Blank page ...
Страница 41: ...Troubleshooting 38 Blank page ...
Страница 50: ...Blank page ...
Страница 51: ...Blank page ...
Страница 52: ......