Perform a power outage test to confirm whether the UPS is working properly.
②
Press .
①
Set
MAIN MCCB
on the front of the UPS to “ON.”
[Select]=INV ON
[Back]=Cancel
- ONLINE
****
The screen changes
after approx. 1 sec.
INV ON
Control OK
3
2
③
Press .
-
STANDBY
–
****
④
Check that the LCD display and LEDs are in the states shown in the diagram below.
Check that “Green
INPUT
” has changed from blinking to always on, and then proceed to step
②
.
①
Set this to “ON”
Green: Blinking Lit
Green: Off
Red: Off
SANYO DENKI
SANUPS A11J
- STANDBY -
Vi=*** Fi=***
After approx. 5 sec.
Green: Lit
Green: Lit
Green: Lit
Red: Off
Green: Lit Green: Off Red: Off
- ONLINE
–
****
Step
①
is not necessary if the
procedure in §7.2 “Charging UPS”
was performed beforehand.
T i p
Green: Off
Green: Green: Off Red: Off
Blinking
Lit
↓
Содержание SANUPS A11J
Страница 1: ...M0009237 5 kVA Instruction Manual ...
Страница 25: ...Installation and Wiring 22 Blank page ...
Страница 41: ...Troubleshooting 38 Blank page ...
Страница 50: ...Blank page ...
Страница 51: ...Blank page ...
Страница 52: ......