Preparation Before Operation
23
§
7
7
.
.
P
P
r
r
e
e
p
p
a
a
r
r
a
a
t
t
i
i
o
o
n
n
B
B
e
e
f
f
o
o
r
r
e
e
O
O
p
p
e
e
r
r
a
a
t
t
i
i
o
o
n
n
§
7
7
.
.
1
1
C
C
h
h
e
e
c
c
k
k
i
i
n
n
g
g
U
U
P
P
S
S
S
S
e
e
t
t
t
t
i
i
n
n
g
g
s
s
See §3. “Setting UPS” of the
LCD Panel Operating Manual
, and check the settings.
The factory default settings of the UPS are indicated by the “
*
” mark in the Default Setting column of the
“List of Settings.”
When the default settings do not match your
environment, application, load specifications, and other
requirements, change the settings.
When using the UPS without changing the
default settings
You can also change the settings after starting load device operation.
However, the UPS needs to be restarted for setting items indicated by “
★
” in the Setting Item column
of the setting item list. Setting such items at the preparation stage prior to UPS operation is
recommended because the load devices also need to be stopped when the UPS is restarted.
Tip
Proceed to §7.2 “Charging UPS.”
②
Set
MAIN MCCB
on the front of the UPS to “ON.”
③
Change the settings.
See the page on each item in the LCD Operation
Manual.
④
Set
MAIN MCCB
on the front of the UPS to “OFF.”
Proceed to §7.2 “Charging UPS.”
①
Check the settings in the setting menu of the UPS.
Set this to “OFF”
Set this to “ON”
Содержание SANUPS A11J
Страница 1: ...M0009237 5 kVA Instruction Manual ...
Страница 25: ...Installation and Wiring 22 Blank page ...
Страница 41: ...Troubleshooting 38 Blank page ...
Страница 50: ...Blank page ...
Страница 51: ...Blank page ...
Страница 52: ......